The Result
Shanahan Engineering recently completed the commissioning of Block 2 of PP12 Power Plant in Saudi Arabia, a 2,175 MW power plant consisting of two blocks of four on 1 GE Frame 7EA gas turbines.
We mobilised at short notice a stand-alone commissioning team, from commissioning lead to LOTO/Permit engineer to accelerate the commissioning of the plant working with the EPC Contractor. Within a five month period, we successfully reached our customers goal, of operating the combined cycle by the summer months.